Xiantao to Honghu Expressway

14384806444175977.jpg
14384806604731886.jpg
14384806741150891.jpg
+
  • 14384806444175977.jpg
  • 14384806604731886.jpg
  • 14384806741150891.jpg

Xiantao to Honghu Expressway (Xianhong Expressway) is an important section of Xianning to Xiaogan Expressway through Xiantao on the West Ring Road. Xiantao section starts from the south bank approach of the Hanjiang Grand Bridge at the junction of Xiantao and Xiaogan (Hanchuan), connects with the proposed Xiaogan section of Wuhan City Ring Expressway, ends at the Dongjing River Bridge at the junction of Xiantao and Honghu, and connects with Honghu section, The Honghu section starts from the south side of the five lakes of the Dongjing River in Honghu City, Jingzhou City, and connects with the Xiantao section.

Xiantao to Honghu Expressway

As a part of the ring expressway of Wuhan City Circle, Xianhong Expressway is the "8+1" urban comprehensive transportation system circle in the "three circles" of the "three circles" in the "seven channels, three circles, six hubs and one system" expressway network layout planning of our province. It consists of four parts: East Ring, West Ring, South Ring and North Ring.

Xiantao to Honghu Expressway

Xiantao section starts from the south bank approach of the Hanjiang Grand Bridge at the junction of Xiantao City and Xiaogan City (Hanchuan City), connects with the Xiaogan section of the proposed Wuhan City Circle Expressway, ends at the Dongjinghe Bridge at the junction of Xiantao City and Honghu City, and connects with Honghu section. It crosses the 318 National Highway, Hanyi Expressway, Daxing North Channel, Shahu River, Tongshun River, enters Dujiatai flood diversion and storage area, runs through 3 towns and 1 office (Changkou Town, Xiliuhe Town, Shahu Town, Longhuashan Office), 38 administrative villages, 1 fishing ground (Wuhu Fishing Ground), and 1 reed factory. The total length of the route is 41.266 kilometers, and three connecting lines are constructed simultaneously, with a total length of 11.559 kilometers. There are 4 interchanges (Xiantao North Interchange, Xiantao Hub Interchange, Xiantao East Interchange, and Shahu Interchange), 1 service area (Xiantao South Service Area), 1 monitoring and management sub-center, 1 maintenance work area, and 3 ramp toll stations. The approved estimate of the project is 4.766 billion yuan, and the construction period is 48 months.

Xiantao to Honghu Expressway

Construction site of Liangcheng silicon core pipe of Xianhong Expressway

The Honghu section starts from the south side of the five lakes of the East Jinghe River in Honghu City, Jingzhou City, connects with the Xiantao section, crosses with the Honghu-Jianli section of the "Hanhongjian" highway, passes through the West Bank Village, Dizhangkou Village, Xintan Town, Honghu City, and ends near Tuanjie Village, Yanwo Town, Honghu City, and connects with the north bank of the Jiayu Yangtze River Highway Bridge. The total length of the route is 19.796km, and the whole line is of bridge structure, including 8 super-large bridges of 19291m, 2 major bridges of 505m, 2 interchanges, 1 ramp toll station, 1 service area and 1 maintenance area. The approved budget of the project is 3.4727 billion yuan, and the total project duration is 36 months.